Lockout / Tagout Procedure Pack: LOTO procedure templates, logs and printable tags
Lockout/tagout keeps people from being hurt when a machine starts unexpectedly during servicing — and missing paperwork is one of the most commonly cited safety violations. This pack gives a small shop or facility the forms it needs to write, use and document a program.
It includes the six-step procedure on one page, a machine-specific procedure form, an energy-source inventory, lock and tag assignment and activity logs, an annual inspection form, a training roster and six printable danger tags per page.
What’s inside
- The 6-step procedure on one page
- Machine-specific procedure form
- Energy-source and isolation-point inventory
- Lock and tag assignments and lockout activity log
- Annual inspection form and training roster
- Printable danger tags
A look inside


Who it’s for
- Machine shops, fabricators and small manufacturers
- Maintenance departments and facility teams
- Contractors servicing equipment on site
- Safety coordinators writing a first LOTO program
How it works
- Complete one machine-specific procedure for each machine and post it at the machine.
- Log every lockout and keep the lock and tag assignments current.
- Inspect each procedure at least once a year and keep the training roster up to date.
Questions
Is this a complete LOTO program?
It gives you the forms and a general procedure. Your employer must still write a program that fits your equipment and meets OSHA 29 CFR 1910.147 or your local rules, with trained authorized employees and periodic inspections.
What are the tags?
Printable DANGER tags — six per page — with lines for name, department, date and reason. Print on card stock and attach with zip ties beside a lock.
Can I use this in my home shop?
Yes. The same energy-isolation habit protects you when changing blades or clearing jams on a table saw or planer.
What format is it?
A printable PDF, ten pages.
General guidance and record-keeping aids, not legal, engineering or safety advice. See the store terms & refunds.
More from the shop
Rather not print? Track it in software.
Facility CMMS turns checklists like these into recurring inspections and work orders with QR codes, reminders and a one-click compliance report. Try it free for 14 days — no card needed.